AP-15 Audenasa
Spain
The Navarra Highway joins the towns of Tudela and Irurzun, linking up with the Ebro highway in the south and with the dual-carriageways towards San Sebastián and Vitoria in the north. The concession contract covers construction, maintenance and operation.
Relevant Data
Total investment:
230
,
153,000 euros
Share capital:
95,000.97 euros
Holding:
50%
Year awarded:
1973
Concession term:
56 years
Length:
112.6 km
Average Daily Traffic in 2020:
13,233
Average Daily Traffic in 2021*:
16,280
*Traffic data was affected in 2020 by the mobility restrictions derived from the states of alarm and emergency decreed by the different governments (national and local) as a result of the global Covid-19 pandemic. These traffic data have experienced a gradual recovery during the year 2021 and although the pre-pandemic levels have not been reached yet, it is estimated that the trend will be positive for this year
Concessionaire